Contents
BUILD A GYM / BUILT STRENGTH
Technician
field manual.
A day-one reference for the work between receiving a machine and getting it safely out the door. Start with the unit’s IMS record, follow its live form, and make the next step possible for the team after you.
BEFORE YOU START AN ASSEMBLY
- Match the unit. Confirm its IMS and serial label against the record.
- Open the Assembly Check. Find the exact model manual, review the diagram, and check all parts.
- Read the order context. Watch for priority status, bundles, and special instructions.
Prepared 26 September 2026 · For Build A Gym warehouse staff
THE BIG PICTURE
How a unit moves
Every serialized physical unit has a Product Intake record in the Build a Gym Airtable base, called the IMS. Its Stage tells you where it is right now. The unit’s Condition sets its work path.
Assembly path
Receive → assemble and check → ready for an order → crate or palletize → ship. New stock uses an Assembly Check; there is no reman Job for it.
Reman path
Receive → assign a Job → teardown and rebuild → test → ready for an order → palletize → ship. Used units can share the Job side of the IMS but are sold as-is, without a promised rebuild.
Machines are tracked one by one by IMS ID. Small Pack items such as dumbbells and plates are allocated by quantity from a Crate. Check which kind of stock you have before recording a movement.
Stage names you will see
Read the live Stage on the unit before taking action. These are the current Product Intake stage values, in approximate process order. A sold unit may enter as Sold - Inbound; a shortage may interrupt either path as Awaiting Parts.
| Stage | What it means |
|---|---|
| Incoming | Expected or in transit; not physically received. |
| Sold - Inbound | Already sold while still in transit. |
| Processing Queue | Received and waiting for its next work path. |
| Assembly Queue | New equipment waiting to be assembled. |
| Assembly Complete - Stock | Assembled and held as general stock. |
| Assembly Complete - Showroom | Assembled and placed in the showroom. |
| Assembly Complete - Committed | Assembled and already committed to an order. |
| Awaiting Parts | Work is blocked by a missing part. |
| Reman Queue | Reman or used unit waiting for a technician. |
| In Reman | Unit is actively being rebuilt. |
| Ready for Sale | Processed and available to be picked for an order. |
| Ready to Ship | Assigned to an order and cleared for shipping prep. |
| Palletized | Built onto a pallet or into a crate for freight. |
| Allocated | Small Pack or bulk quantity fully claimed for an order. |
| Shipped | Physically gone out the door. Treat as locked. |
| Disposed - Scrap | Removed from sellable inventory as scrap. Treat as locked. |
| Disposed - Parts | Broken down for parts. Treat as locked. |
| Disposed - Display | Removed from sellable inventory for display. Treat as locked. |
THE RECORD BEHIND THE WORK
Records and forms
Airtable is the daily system of record. The Build a Gym base is also called the IMS. Each serialized unit has its own Product Intake record and IMS ID. A Shopify order becomes a Sales Order in the IMS; each order line is a Work Order. New equipment is assembled as stock or for an order. Reman and used units get a separate Job per physical unit.
Record the work
Assembly Checks, Parts Requests, bin moves, palletization, dispatch, transfers, and closing forms live here.
Starts the order
Customer orders flow into Airtable. Floor staff usually work from the IMS rather than Shopify.
Carry alerts
Assignments, priority notices, shortages, and special-instruction acknowledgment can arrive here.
Forms and checklists move the process forward. Do not mark a stage complete early, leave blockers in a chat or verbal handoff alone, or tell dispatch an order is ready unless the system shows it. A missing form can be the reason a unit does not advance.
WORKSTATION CHECKLIST
Assemble, test, sign off
Complete the live Assembly Check for the unit. Fields vary by machine type; this is the common sequence. Find the exact model’s assembly manual in the approved company Drive before the build. The model manual and live form provide the detailed instructions and checks.
- Match the physical IMS and serial label to the record, SKU, description, and order context.
- Unpack all parts. Review the model diagram and compare the parts against it.
- Confirm all parts are present. If one is missing, photograph the diagram with the part marked, write the details in the Assembly Check, and raise a Parts Request.
- Read any bundle, priority-order, and special-instruction fields before building.
- Follow the model-specific checks for hardware, end caps or foot pads, badges or decals, structural damage, finish, and cleanliness.
- Apply thread locker where the selectorized or plate-loaded checklist requires it.
- Complete unloaded motion and loaded movement tests where required. Re-check hardware after the loaded test.
- For weight stacks, verify plate count, shrouds, labels, and cable routing. For racks, verify level, feet, and badge.
- Take every required photo, including White Camera photos and any machine-specific photo fields. Clear photos help resolve later service or shipment questions.
- If it is a bundle, check every listed component, quantity, and SKU before calling it complete.
- Record the work and any useful notes while it is fresh. Complete Tech Sign-Off only when the build, checks, and form are complete.
- Confirm the completed record appears in the system before moving on.
Special instructions must be acknowledged through the Slack “Mark as Read” action. A unit cannot move to Ready to Ship while they are unacknowledged. If the unit seems stuck, check the form and linked records.
RECEIVING, PARTS, AND LOCATION
Keep the inventory trail intact
A unit is useful to the next team only when its physical location and IMS record agree. Receiving, parts, and transfers all leave a trail.
Serialized units
Machines and other tracked units get one Product Intake record and IMS ID per physical unit. Use that number on the unit, label, and every related form.
Small Pack stock
Bulk items such as dumbbells, weight plates, and kettlebells live in Crates. Allocate the correct quantity from the Crate to a Work Order; do not treat each piece as a separate serialized machine.
When a part is missing
- Document the missing item in the Assembly Check. Mark it on a diagram photo and describe it clearly.
- Raise a Parts Request linked to the right unit or Work Order. If the part is not in the catalogue, use the “Part (Not Listed)” path with a photo or diagram.
- Let the blocked status show. Do not mark a build complete or rely on an informal message to order the part.
Parts is the catalogue. A Parts Request is the specific ask. Parts Consumed / BOM records what was actually used on a Job or Work Order. They are different records for different purposes.
Use a Bin Assignment Request for a unit or Crate’s warehouse address. Log moves between Walburg, Warehouse 1, Warehouse 2, and Refurb & Office in Transfers, linked to the IMS unit or Crate and the reason. Catch any unlogged movement before the end-of-day checklist is submitted.
READY TO SHIP → PALLETIZED
Make it shipment ready
Ready for Sale means a processed unit can be picked for an order. Ready to Ship means the assigned unit has cleared its checks, linked parts, and order instructions. Those are different gates. A shipped package also needs the correct release checklist before it leaves.
- Confirm the unit, SKU, Work Order, attachments, and bundle components match the order.
- Confirm Assembly Check or Reman Check sign-off and required photos are complete.
- Check that any special instructions are acknowledged. For reman, confirm the BOM is linked to both the unit and Job.
- Build the pallet or crate required for that equipment and shipping plan. Record palletized weight and length × width × height.
- Confirm all parts and attachments are included. Protect the console and edges. Verify free-weight quantities and any weight stack or plates.
- Take the required unwrapped, close-up, front, rear, left, right, and final wrapped photos. Record time taken.
- Set the BUILT Strength Crate? field correctly when the unit uses that freight crate process.
Do not send an item out because someone says it is ready. The IMS must show readiness, the package must be documented, and the matching dispatch or pickup release record must be complete. If a check fails, send it back for correction.
THE LAST GATE
Dispatch and pickup
Choose the form for how the order actually leaves. The forms differ because a full truckload, a local route, a regional pickup, and a customer pickup carry different count and handoff risks.
Local or regional delivery
Complete the Dispatch Checklist for the route and vehicle: crew, truck, route, starting mileage, vehicle and DEF checks where applicable, Dispatch Kit, moving equipment, and customer location notification before departure.
Full truckload freight
Use FTL Order Checkout. Photograph the packing slip, load, and any pre-load damage. Double-count sub-units before and after loading, check every SKU and free weight against the manifest, verify the required purple checkout stickers, and confirm BUILT stacks, crates, loose attachments, pins, and hardware are all loaded. Record seal and driver details; sign off that nothing is left behind.
Regional load-out
Use the NCD Load Out log for the assigned regional delivery or pickup run. Record package or item counts, carrier PRO/tracking number where used, and BOL or packing-list photos. NCD work may be scheduled under “Delivery and Pickup.”
Customer pickup
Capture a load photo, the customer’s Terms & Conditions acknowledgment, and their signature. Public pickup guidance calls for a weekday appointment; the customer brings a suitable truck or trailer and tie-downs and secures the load after warehouse staff help load it.
FTL = full truckload. NCD is the name of a regional load-out process. BOL = bill of lading. PRO = freight tracking number.
EVERY SHIFT, EVERY LOCATION
Close the warehouse well
Assembly is only part of the job. Cleaning, staging, moving equipment, logging transfers, and closing the assigned site are daily technician work. Each location has its own live Airtable end-of-day checklist. Use the one for the site you are closing.
Put equipment away
Return equipment and tools to their assigned places. Get training on the equipment your site uses before operating it.
Clean the working areas
Follow the cleaning items on your site’s form, organize tools and parts, and report supplies that need replenishment.
Stage for tomorrow
Record current staging where the form asks, and complete Transfer forms for any inventory movement that was not yet logged.
Complete site checks
Follow every safety and security item on your assigned site’s live checklist. Report an item you cannot confirm to your lead; do not mark it complete by assumption.
The live checklist for your assigned site contains its specific closing steps. Ask your lead when an item is unclear or cannot be completed.
Log the Transfer against the IMS unit or Crate, with the destination and reason, on the same day. A unit in the wrong place on paper costs the next shift time and can delay an order.
THE OTHER FLOOR PATH
Reman in five minutes
Remanufactured equipment shares the warehouse and IMS with BUILT Strength. It is not new. A technician takes a unit through teardown, cleaning and repair, rebuild, functional testing, and final safety checks. A Job ties that work to the unit and Work Order.
The Reman Check captures what failed, cosmetic condition, work performed, parts consumed, final functional and safety checks, and finishing steps such as labels and staging. The exact fields depend on equipment type.
A reman unit cannot move to Ready to Ship until its parts-consumed record is linked correctly on both the IMS unit and the Job. If it looks stuck, verify those links and the completed form before asking for an override.
“Used” is a separate condition and is sold as-is. A used unit may share the Job side of the IMS; do not describe it to customers as remanufactured or promise that it received a full rebuild.
QUESTIONS YOU MAY HEAR
Company facts worth knowing
Who we are
Build A Gym, formerly CTX Home Gyms, has been building gyms since 2020. BUILT Strength is its in-house equipment line. BUILT machines are made by a partner facility in Shandong, China, then assembled, inspected, and supported by the Texas team.
BUILT series
OG is plate loaded, Fractal is selectorized, and Infinite focuses on powerlifting and bodybuilding. Foundation and Throwback also appear in current product collections. Use the product’s exact SKU and model manual rather than guessing from a series name.
Warranty
New and remanufactured machines have one year of parts and labor coverage. New BUILT machines also have lifetime frame coverage. Used equipment sold as-is has no warranty. Warranty registration is due within 30 days of delivery.
BAG Care+
Eligible cardio and strength machines can add one or two years of coverage beyond the standard year. It must be added before shipment. Console and consumable coverage stays in the first year under the main Care+ terms. Refer detailed eligibility or claims to the current warranty page.
Delivery and assembly
Delivery and assembly are checkout shipping options. Inside Delivery & Assembly includes first-floor placement, assembly, testing, and packaging removal. Stairs and upper floors require advance coordination. Nationwide service coverage is different from the published lower-48 driveway freight area.
Need to route a question?
Build A Gym’s general contact is (512) 591-8553 or info@buildagym.com. For current policy wording, use the official warranty, Care+, and delivery pages.
LOOK IT UP MID-SHIFT
Glossary
| Term | Meaning |
|---|---|
| BAG Care+ | Optional extended warranty for eligible machines, added before shipment. |
| Bin Location | A warehouse shelf or slot address; assigned through Bin Assignment Requests. |
| BOM | Bill of Materials: parts actually consumed on a Job or Work Order. |
| Condition | New, Remanufactured, or Used. It determines the unit’s work path. |
| Crate / Crate Allocation | Where Small Pack stock lives; allocation records the quantity claimed for a Work Order. |
| Delivery Method | How the order leaves: FTL, local delivery, NCD, pickup, or small parcel. |
| Dispatch | The process and checklist for loading and driving out a local or regional delivery. |
| FTL | Full Truckload, with its own detailed Order Checkout checklist. |
| IMS | Inventory Management System: the Build a Gym Airtable base and, in floor shorthand, a serialized unit record. |
| IMS ID | Unique number on a serialized unit and its label, such as 001777. |
| Job | Record for one reman or used-path unit, linking it to a Work Order and technician. |
| NCD | Historically “Non-Cardio Delivery”; a regional load-out process now commonly booked under Delivery and Pickup. |
| Palletization | Preparing, measuring, wrapping or crating, and photo-documenting a unit for freight. |
| Previous Stage | The unit’s prior Stage; the system’s reference if a non-final stage needs review. |
| Priority Order | Sales Order marked urgent; its linked work is flagged and technicians are alerted. |
| Ready for Sale | Fully processed stock available to be picked for an order. |
| Ready to Ship | Assigned unit that has cleared the checks needed before shipping prep. |
| Sales Order (SO) | Customer order imported from Shopify, such as BAG-4233. |
| Serial Number | The manufacturer or physical unit serial; distinct from IMS ID. |
| SKU | Product identifier shared by Shopify and Airtable. |
| Small Pack | Bulk inventory, such as plates or dumbbells, allocated by quantity from a Crate. |
| Special Instructions | Customer order note that must be acknowledged before the linked unit can ship. |
| Stage | Where the unit is in the IMS pipeline right now. |
| Untouchable stage | Shipped or a Disposed stage; automation will not silently reuse or restage the unit. |
| Work Order (WO) | One SKU and quantity line within a Sales Order, such as 4233-1. |
IF YOU REMEMBER SIX THINGS
Rules to remember
- Match the physical unit to the IMS record. A good build on the wrong unit is still a wrong order.
- Record work while doing it. An incomplete form can stop the next stage; an early “complete” mark can send bad information downstream.
- Photograph what the form asks for. Clear evidence helps receiving, dispatch, service, and customer support months later.
- Use the right inventory model. Serial units use IMS IDs; Small Pack stock uses Crate quantities.
- Respect the gates. Missing parts, special instructions, BOM links, quality checks, and release forms must be resolved in the live process.
- Shipped and Disposed are locked. Flag a mistake to a lead. A returned unit goes through the return flow, not a manual backward stage edit.
Source and version notes
This manual combines the supplied current IMS context with internal signed system-use, assembly, and fulfillment guides, and current public brand, warranty, and delivery pages. The older signed guides use some form and stage names that differ from today’s IMS context. If a screen differs from this manual, use the live form and ask your lead before changing a stage or skipping a check.